Your shopping cart is empty!
PDF Preview
International Electrotechnical Commission, 10/01/2023
Publisher: IEC
File Format: PDF
$256.00$512.00
Published:01/10/2023
Pages:740
File Size:1 file , 9.5 MB
Note:This product is unavailable in Ukraine, Russia, Belarus
This part of IEC 61375 applies to all equipment and devices implemented according to IEC 61375-2-3:2015, IEC 61375-2-5:2014 and IEC 61375-3-4:2014, i.e. it covers the procedures to be applied to such equipment and devices when the conformance should be proven.
The applicability of this document to a TCN implementation allows for individual conformance checking of the implementation itself, and is a pre-requisite for further interoperability checking between different TCN implementations.
Materials for printed boards and other interconnecting structures – Part 6-3: Sectional specification set for reinforcement materials – Specification for finished fabric woven from "E" glass for printed boards
$95.00 $190.00
Instrument transformers - Part 1: General requirements
$240.00 $481.00
Photovoltaic devices - Part 2: Requirements for photovoltaic reference devices
$72.00 $145.00
Amendment 1 - Power Cables With Extruded Insulation And Their Accessories For Rated Voltages Above 30 KV (Um= 36 KV) Up To 150 KV (Um = 170 KV) - Test Methods And Requirements
$139.00 $278.00