a) regarding temperature-rise test an alternative method for liquid filled transformers is (re)introduced and the temperature-rise test method for dry-type transformers is specified more precisely;
b) testing procedure for short time and peak withstand current tests are specified more precisely;
c) assessment of electromagnetic fields is considered including a type test (optional) according IEC/TR 62271-208:2009;
d) influence of the product on the environment is considered (Clause 12);
e) internal arc test requirements have been adapted to IEC 62271-200:2011 and requirements for the assessment of pressure relief volumes below the floor / ground has been assigned;
f) the method for defining the load factor in an enclosure for liquid filled transformers is extended with different temperature rises for the transformer outside the enclosure (Annex DD);
g) for the calculation of the load factor of dry-type transformers in an enclosure the insulation systems according to IEC 60076-1:2011, Tables B.1 and B.2 are worked out in detail.
This publication is to be read in conjunction withIEC 62271-201:2007.
More IEC standard pdf
IEC 61189-5-503 Ed. 1.0 b:2017
Test methods for electrical materials, printed board and other interconnection structures and assemblies - Part 5-503: General test method for materials and assemblies - Conductive anodic filaments (CAF) testing of circuit boards
$95.00 $190.00
IEC 62153-4-3 Ed. 2.0 en:2013
Metallic communication cable test methods - Part 4-3: Electromagnetic compatibility (EMC) - Surface transfer impedance - Triaxial method
$164.00 $329.00
IEC 60079-10-1 Ed. 2.0 en:2015
Explosive atmospheres - Part 10-1: Classification of areas - Explosive gas atmospheres
$187.00 $375.00
IEC 62656-5 Ed. 1.0 b:2017
Standardized product ontology register and transfer by spreadsheets - Part 5: Interface for activity description
$208.00 $417.00