IEC 63132-1 Ed. 1.0 b:2020

Guidance for installation procedures and tolerances of hydroelectric machines - Part 1: General aspects

International Electrotechnical Commission, 04/20/2020

Publisher: IEC

File Format: PDF

$117.00$234.00


Published:20/04/2020

Pages:53

File Size:1 file , 5.4 MB

Note:This product is unavailable in Ukraine, Russia, Belarus

IEC 63132-1:2020 The purpose of this part of IEC 63132 is to establish, in a general way, suitable procedures and tolerances for the installation of hydroelectric turbines and generators. This document presents a typical assembly. There are many possible ways to assemble a unit. The size of the machines, design of the machines, layout of the powerhouse and delivery schedule of the components are some of the elements that could result in additional steps, the elimination of some steps and/or assembly sequences.

More IEC standard pdf

IEC 62040-2 Ed. 2.0 b:2005

IEC 62040-2 Ed. 2.0 b:2005

Uninterruptible power systems (UPS) - Part 2: Electromagnetic compatibility (EMC) requirements

$127.00 $254.00

IEC 60947-6-1 Ed. 2.0 b:2005

IEC 60947-6-1 Ed. 2.0 b:2005

Low-voltage switchgear and controlgear - Part 6-1: Multiple function equipment - Transfer switching equipment

$155.00 $310.00

IEC 61249-4-2 Ed. 1.0 en:2005

IEC 61249-4-2 Ed. 1.0 en:2005

Materials for printed boards and other interconnecting structures - Part 4-2: Sectional specification set for prepreg materials, unclad - Multifunctional epoxide woven E-glass prepreg of defined flammability

$47.00 $95.00

IEC 60335-2-53 Amd.1 Ed. 3.0 b:2007

IEC 60335-2-53 Amd.1 Ed. 3.0 b:2007

Amendment 1 - Household and similar electrical appliances - Safety - Part 2-53: Particular requirements for sauna heating appliances

$23.00 $47.00