Your shopping cart is empty!
PDF Preview
International Electrotechnical Commission, 12/01/2022
Publisher: IEC
File Format: PDF
$196.00$392.00
Published:01/12/2022
Pages:68
File Size:1 file , 5.7 MB
Note:This product is unavailable in Ukraine, Russia, Belarus
It is important that organizations providing services are able to develop and implement preparedness measures to maintain and restore required services in the event of a disaster.
Because many of the services depend on electricity, an electricity continuity plan (ECP) and an electricity continuity system (ECS) can help maintain and restore necessary services in power failure that is caused by a disaster. IEC 63152 describes the concept and minimum requirements of ECP and ECS based on a business continuity plan (BCP).
However, depending on the type, degree, and quality of services, there are various ways to respond to disasters, and ECP and ECS cannot be created in the same way.
This document is designed to serve as a guideline for the design of basic parts by showing the process and points to be noted in the preparation of ECP and ECS for power outages based on normal service.
It is assumed that ECP and ECS will be useful to urban developers, urban operators, public service providers, disaster managers and system integrators, and manufacturers of systems related equipment and facilities.
Corrigendum 1 to Safety requirements for secondary batteries and battery installations - Part 5: Safe operation of stationary lithium ion batteries
$108.00 $216.12
Radio frequency and coaxial cable assemblies - Part 4-2: Detail specification for semi-rigid cable assemblies (jumper) - Frequency range up to 6 000 MHz, type 50-9 semi-rigid coaxial cable
$47.00 $95.00
Corrigendum to Amendment 1 to Automatic electrical controls - Part 2-8: Particular requirements for electrically operated water valves, including mechanical requirements
$108.00 $216.28
Industrial communication networks - Wireless communication networks - Part 2: Coexistence management
$227.00 $455.00