IEEE 1310-2012

IEEE Recommended Practice for Thermal Cycle Testing of Form-Wound Stator Bars and Coils for Large Rotating Machines

IEEE, 05/21/2012

Publisher: IEEE

File Format: PDF

$40.00$80.00


Published:21/05/2012

Pages:30

File Size:1 file , 620 KB

Note:This product is unavailable in Russia, Belarus

This procedure is intended for form-wound bars/coils for rotating machines rated 10 kV or more at 50 Hz or 60 Hz that are subjected to many transitions from no-load to full-load current during normal operations, and where rapid load variations are typical. Only the thermal cyclic degradation within the groundwall insulation and/or the conductor package and delamination of the groundwall insulation from the conductor are addressed by this test. Examples of machine types that typically exhibit rapid load transitions include: -- Combustion turbine generators -- Pumped storage or peaking duty hydrogenerators -- Synchronous condensers -- Cyclic duty water pump motors Various pass/fail criteria are presented, and the ones that apply in a specific circumstance must be agreed between the user and the manufacturer prior to commencement of testing. Whether a particular bar or coil has passed or failed is best determined by comparing the test results from a number of stator bars or coils.

More IEEE standard pdf

IEEE C37.26-2003

IEEE C37.26-2003

IEEE Guide for Methods of Power-Factor Measurement for Low-Voltage Inductive Test Circuits

$43.00 $87.00

IEEE C57.19.01-2000

IEEE C57.19.01-2000

IEEE Standard Performance Characteristics and Dimensions for Outdoor Apparatus Bushings

$59.00 $119.00

IEEE C37.40-2003

IEEE C37.40-2003

IEEE Standard Service Conditions and Definitions for High-Voltage Fuses, Distribution Enclosed Single-Pole Air Switches, Fuse Disconnecting Switches, and Accessories

$47.00 $95.00

IEEE 43-2000

IEEE 43-2000

IEEE Recommended Practice for Testing Insulation Resistance of Rotating Machinery

$56.00 $112.00