This guide describes the electrical and control design of water conveyance facilities associated with hydroelectric projects including associated penstocks, valves, and gates. The guide includes guidance to plan and prepare designs; however, it does not include details of installation, operation, or maintenance guidelines and methodologies. This guide is applicable to design of new facilities and rehabilitation or replacement of existing facilities.
More IEEE standard pdf
IEEE 1353-1994
IEEE Standard for Information Technology--ASCE and Presentation Layer Services--Application Program Interface (API) [C Language Binding]
$69.00 $138.00
IEEE 379-1994
IEEE Standard Application of the Single-Failure Criterion to Nuclear Power Generating Station Safety Systems
$60.00 $120.00
IEEE 1193-2003
IEEE Guide for Measurement of Environmental Sensitivities of Standard Frequency Generators
$52.00 $104.00