• IEEE C37.123-1996

IEEE C37.123-1996

IEEE Guide to Specifications for Gas-Insulated, Electric Power Substation Equipment

IEEE, 11/30/1996

Publisher: IEEE

File Format: PDF

$67.00$134.00


Published:30/11/1996

Pages:40

File Size:1 file , 2.3 MB

Note:This product is unavailable in Russia, Belarus

This guide covers the technical requirements for the design, fabrication, testing, installation, and in-service performance of a gas-insulated substation (GIS). The supplier should furnish all equipment and material necessary to provide the complete GIS as shown on the functional one-line diagram, which may consist of circuit breakers (CB), disconnect switches (DS), maintenance ground switches (MGS), fast-acting ground switches (FGS), voltage transformers (VT), current transformers (CT), SF6-to-air bushings, SF6-to-cable termination, buses, cable termination enclosures, transformer or reactor bushing enclosures, enclosed surge arresters, elbows, bellows, controls, cables for control, protection and metering, density monitors, platforms, special tools, and SF6 gas for initial filling. All equipment and material shall be prefabricated, factory assembled, tested, and shipped in the largest practical assemblies. Assembled equipment should be capable of withstanding electrical, mechanical, and thermal ratings of the specified system. All joints and connections should be able to withstand the forces of expansion, vibration, contraction, and specified seismic requirements without deformation, malfunction, or leakage. Equipment shall be capable of withstanding the specified outdoor or indoor environment. Optimized arrangements, shown in annex A, are required to reduce installation time, provide ease of operation, minimize maintenance and repair prices, and facilitate future additions as described in the specifications. The user should identify space or area limitations for the GIS, driveway access, and any overhead clearance restrictions. Final arrangement shall be as mutually agreed to between the user and the supplier. Field assembly maintenance, cost of operation, and capitalized cost of maintenance during equipment life will be considered in bid evaluations. To elicit a complete and uniform response from each bidder, proposal data is provided in clause 7.

More IEEE standard pdf

IEEE PC37.100.7

IEEE PC37.100.7

IEEE Approved Draft Guide for the Evaluation of Performance Characteristics of Non-Sulfur Hexafluoride Insulation and Arc Quenching Media for Switchgear Rated Above 1000 V

$75.00 $150.00

IEEE PC57.168

IEEE PC57.168

IEEE Draft Guide for Low Frequency Dielectric Testing for Distribution, Power and Regulating Transformers.

$29.00 $58.00

IEEE P2845

IEEE P2845

IEEE Draft Trial Use Standard for Testing and Evaluating the Dielectric Performance of Celebratory Balloons in Contact with Overhead Power Distribution Lines Rated up to 38 kV System Voltage

$42.00 $85.00

IEEE P3133

IEEE P3133

IEEE Approved Draft Guide for Direct Current (DC) Ice-Melting Technology of Overhead Transmission Lines

$34.00 $68.00