• IEEE C37.123-1996

IEEE C37.123-1996

IEEE Guide to Specifications for Gas-Insulated, Electric Power Substation Equipment

IEEE, 11/30/1996

Publisher: IEEE

File Format: PDF

$67.00$134.00


Published:30/11/1996

Pages:40

File Size:1 file , 2.3 MB

Note:This product is unavailable in Russia, Belarus

This guide covers the technical requirements for the design, fabrication, testing, installation, and in-service performance of a gas-insulated substation (GIS). The supplier should furnish all equipment and material necessary to provide the complete GIS as shown on the functional one-line diagram, which may consist of circuit breakers (CB), disconnect switches (DS), maintenance ground switches (MGS), fast-acting ground switches (FGS), voltage transformers (VT), current transformers (CT), SF6-to-air bushings, SF6-to-cable termination, buses, cable termination enclosures, transformer or reactor bushing enclosures, enclosed surge arresters, elbows, bellows, controls, cables for control, protection and metering, density monitors, platforms, special tools, and SF6 gas for initial filling. All equipment and material shall be prefabricated, factory assembled, tested, and shipped in the largest practical assemblies. Assembled equipment should be capable of withstanding electrical, mechanical, and thermal ratings of the specified system. All joints and connections should be able to withstand the forces of expansion, vibration, contraction, and specified seismic requirements without deformation, malfunction, or leakage. Equipment shall be capable of withstanding the specified outdoor or indoor environment. Optimized arrangements, shown in annex A, are required to reduce installation time, provide ease of operation, minimize maintenance and repair prices, and facilitate future additions as described in the specifications. The user should identify space or area limitations for the GIS, driveway access, and any overhead clearance restrictions. Final arrangement shall be as mutually agreed to between the user and the supplier. Field assembly maintenance, cost of operation, and capitalized cost of maintenance during equipment life will be considered in bid evaluations. To elicit a complete and uniform response from each bidder, proposal data is provided in clause 7.

More IEEE standard pdf

IEEE C57.135-2001

IEEE C57.135-2001

IEEE Guide for the Application, Specification, and Testing of Phase-Shifting Transformers

$100.00 $200.00

IEEE 114-2001

IEEE 114-2001

IEEE Standard Test Procedure for Single-Phase Induction Motors

$67.00 $134.00

IEEE C37.20.7-2001

IEEE C37.20.7-2001

IEEE Guide for Testing Medium-Voltage Metal-Enclosed Switchgear for Internal Arcing Faults

$67.00 $134.00

IEEE 1076-2002

IEEE 1076-2002

IEEE Standard VHDL Language Reference Manual

$189.00 $378.00