IEEE C37.242-2013

IEEE Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement Units (PMUs) for Power System Protection and Control

IEEE, 03/06/2013

Publisher: IEEE

File Format: PDF

$90.00$181.00


Published:06/03/2013

Pages:107

File Size:1 file , 2.1 MB

Note:This product is unavailable in Russia, Belarus

The document provides guidance for synchronization, calibration, testing, and installation of phasor measurement units (PMUs) applied in power system protection and control. The following are addressed in this guide: a) Considerations for the installation of PMU devices based on application requirements and typical bus configurations. b) Techniques focusing on the overall accuracy and availability of the time synchronization system. c) Test and calibration procedures for PMUs for laboratory and field applications. d) Communications testing for connecting PMUs to other devices including Phasor Data Concentrators (PDCs).

More IEEE standard pdf

IEEE C37.30.3-2018

IEEE C37.30.3-2018

IEEE Standard Requirements for High-Voltage Interrupter Switches, Interrupters, or Interrupting Aids Used on or Attached to Switches Rated for Alternating Currents Above 1000 V

$27.00 $54.00

IEEE 1667-2018

IEEE 1667-2018

IEEE Standard for Discovery, Authentication, and Authorization in Host Attachments of Storage Devices

$98.00 $196.00

IEEE C37.30.5-2018

IEEE C37.30.5-2018

IEEE Standard for Definitions for AC High-Voltage Air Switches Rated Above 1000 V

$27.00 $54.00