NACE SP21412-2016/SSPC-CPC 1

Corrosion Prevention and Control Planning

National Association of Corrosion Engineers, 12/01/2016

Publisher: NACE

File Format: PDF

$89.00$179.00


Published:01/12/2016

Pages:30

File Size:1 file , 730 KB

Note:This product is unavailable in Ukraine, Russia, Belarus

This new standard on corrosion prevention and control (CPC) planning is intended to support future CPC improvements to national acquisition and sustainment of equipment, systems, facilities, and infrastructure at an acceptable cost. It provides a standardized framework for a supplier?s plan to control corrosion of supplied products and structures. The standard is intended for use by public and private facility owners/acquisition agencies that require their suppliers to provide corrosion prevention and control procedures as a deliverable provided with the purchased product, installation, or system. The standard includes:
  • Attributes of the supplied product, system or facility that require planning for CPC;
  • Considerations for material selection and design of a product, system or facility to minimize corrosion;
  • Items or topics that should be addressed in a CPC plan;
Items or topics that should be addressed in CPC planning which affect CPC in design, fabrication and construction, operation and use, and maintenance and sustainability.

More NACE standard pdf

NACE TM21423-2017

NACE TM21423-2017

Determination of Substrate and Surface Temperature Limits for Insulative Coatings used for Personnel Protection

$89.00 $179.00

NACE SP0775-2018

NACE SP0775-2018

Preparation, Installation, Analysis, and Interpretation of Corrosion Coupons in Oilfield Operations

$89.00 $179.00

NACE 35100

NACE 35100

In-Line Inspection of Pipelines

$89.00 $179.00

NACE SP0508-2017

NACE SP0508-2017

Methods of Validating Equivalence to ISO 8502-9 on Measurement of the Levels of Soluble Salts

$89.00 $179.00