• NECA 700-2010

NECA 700-2010

Recommended Practice for Installing Underground Nonmetallic Utility Duct (ANSI)

National Electrical Contractors Association, 2010

Publisher: NECA

File Format: PDF

$20.00$40.00


Pages:34

File Size:1 file , 1 MB

Note:This product is unavailable in Russia, Ukraine, Belarus

Describes the application procedures for selecting and adjusting low-voltage overcurrent protective devices to achieve selective coordination. NECA 700 is approved as an American National Standard (ANS).

More NECA standard pdf

NECA 700-2016

NECA 700-2016

Standard for Installing Overcurrent Protection to Achieve Selective Coordination

$25.00 $50.00

NECA 301-2016

NECA 301-2016

Standard for Installing and Testing Fiber Optic Cables

$25.00 $50.00

NECA 230-2016

NECA 230-2016

Standard for Selecting, Installing, and Maintaining Electric Motors and Motor Controllers (1000 Volts and Less)

$25.00 $50.00

NECA 305-2018

NECA 305-2018

Standard for Fire Alarm System Job Practices

$27.00 $55.00