NEMA SBP 5-2015

Considerations in Planning Code Call Implementation in Health Care Facilities

National Electrical Manufacturers Association, 2015

Publisher: NEMA

File Format: PDF

$24.00$49.00


Pages:9

File Size:1 file , 320 KB

Note:This product is unavailable in Ukraine, Russia, Belarus

NEMA SBP 5-2015 is intended to assist facility developers and owners in designing a code call system and associated call handling processes, with the purposes of optimizing response time and complying with regulatory requirements.

More NEMA standard pdf

NEMA XR 9-1984 (R1994, R2000)

NEMA XR 9-1984 (R1994, R2000)

Power Supply Guidelines for X-Ray Machines

$23.00 $46.00

NEMA EW 3-1983 (R1995, R1999, R2002, R2020)

NEMA EW 3-1983 (R1995, R1999, R2002, R2020)

Semi-Automatic Wire-Feed Systems for Arc Welding

$32.00 $64.00

NEMA WC 2-1980 (R1998)/ICEA S-67-401 5th Edition

NEMA WC 2-1980 (R1998)/ICEA S-67-401 5th Edition

Steel Armor and Associated Coverings for Impregnated Paper Insulated Cables (ICEA S-67-401 Fifth Edition)

$104.00 $208.96

NEMA WC 50-1976/ICEA P-53-426 Second Edition (R1999)

NEMA WC 50-1976/ICEA P-53-426 Second Edition (R1999)

Ampacities, Including Effect of Shield Losses for Single Conductor Solid Dielectric Power Cable 15 kV through 69 kV

$117.00 $235.40