Your shopping cart is empty!
PDF Preview
NORSOK, 03/26/2021
Publisher: NORSOK
File Format: PDF
$129.00$258.93
Published:26/03/2021
Pages:52
This document describes the technical, functional, and operational requirements for temporary well testing, production clean-up and bleed-off equipment and systems. The equipment and systems are used for hydrocarbon flow from exploration or development wells on both mobile units and fixed platforms.
Telecom subsystems
$110.00 $220.85
Field instrumentation
$144.00 $289.14
Piping system layout, design and structural analysis
$146.00 $292.08
Material data sheets for structural steel
$138.00 $276.89