This Practice provides the surveyor with requirements for providing adequate field data and information on natural features, existing facilities, above and underground utilities, site topography, and boundaries.

This Practice in conjunction with PIP CVS02005-F - Survey Checklist describes the requirements for quality control, permits, deliverables, and execution for topographic and plant surveys. In case of conflict, the Survey Checklist supersedes this Practice.

More PIP standard pdf

PIP ELSAP01

PIP ELSAP01

Design and Fabrication of Battery Chargers [Editorial Revision]

$50.00 $100.00

PIP ELSMC13

PIP ELSMC13

Low-Voltage Motor Control Centers [Complete Revision]

$50.00 $100.00

PIP PN01PV0C01

PIP PN01PV0C01

Piping Material Specification 1PV0C01 Poly (Vinyl Chloride) (PVC), Cement, 0.000" C.A. Process [Complete Revision]

$37.00 $75.00

PIP ELSMC13D

PIP ELSMC13D

Data Sheets for Low-Voltage Motor Control Centers Data Sheet [Complete Revision]

$106.00 $213.17