Your shopping cart is empty!
PDF Preview
Process Industry Practices, 12/01/2021
Publisher: PIP
File Format: PDF
$50.00$100.00
Published:01/12/2021
Pages:19
File Size:1 file , 380 KB
Note:This product is unavailable in Ukraine, Russia, Belarus
This Practice describes the requirements for excavation, placement, inspection, and management of materials during the site preparation, excavation, and backfill phase of a construction project.
Electronic Entry Data Sheet for Automatic Transfer Systems for Secondary Selective Substations [Complete Revision]
$116.00 $232.68
Automatic Transfer Systems for Secondary Selective Substations [Complete Revision]
$50.00 $100.00
Carbon Steel Ball Valve Descriptions [Technical Revision]
Pipeline Systems, ASME B31.8 Material Specification, Inside Production, Well Site Facility, Class 300, Carbon Steel, 0.03125" (1/32") C.A., Sweet, Design Factor 0.6
$37.00 $75.00