PIP CVS02100

Site Preparation, Excavation, and Backfill Specification [Complete Revision]

Process Industry Practices, 06/01/2019

Publisher: PIP

File Format: PDF

$50.00$100.00


Published:01/06/2019

Pages:19

File Size:1 file , 170 KB

Note:This product is unavailable in Ukraine, Russia, Belarus

This Practice describes the requirements for excavation, placement, inspection, and management of materials during the site preparation, excavation, and backfill phase of a construction project.

More PIP standard pdf

PIP ELSMC11D-EEDS

PIP ELSMC11D-EEDS

Data Sheet for Medium-Voltage Motor Control Center Specification [Complete Revision]

$119.00 $239.77

PIP ELSHT01D

PIP ELSHT01D

Data Sheet for Self-Regulated Electric Heat Trace System Specification [New Practice]

$145.00 $290.35

PIP ELSPS01

PIP ELSPS01

Electrical Requirements for Packaged Equipment [Complete Revision]

$50.00 $100.00

PIP ELSSG02D

PIP ELSSG02D

Data Sheet for Design and Fabrication of Medium Voltage Metal-Clad Switchgear Above 1000 V to 38 kV [Complete Revision]

$114.00 $229.28