• PIP ELSTR01

PIP ELSTR01

Design and Fabrication of Liquid-Immersed Substation Power Transformers 34.5 kV and below, 500 kVA through 15,000 kVA [Complete Revision]

Process Industry Practices, 04/01/2016

Publisher: PIP

File Format: PDF

$82.00$165.00


Published:01/04/2016

Pages:18

File Size:1 file , 690 KB

Note:This product is unavailable in Ukraine, Russia, Belarus

This Practice provides requirements for the design and fabrication of two-winding liquid-immersed air-cooled substation power transformers. This Practice describes the requirements for design, manufacture, inspection, testing, and shipping of three-phase, two-winding, liquid-immersed air-cooled substation power transformers with a rating of 500 kVA through 15,000 kVA for use on systems 34.5 kV and below.

More PIP standard pdf

PIP PCEDO001

PIP PCEDO001

Guidelines for Control Systems Documentation [Complete Revision]

$50.00 $100.00

PIP PCCFL001

PIP PCCFL001

Flow Measurement Design Criteria (Complete Revision)

$50.00 $100.00

PIP ELSAP04D-EEDS

PIP ELSAP04D-EEDS

Electronic Entry Data Sheet for Uninterruptible Power Supply (UPS) System [Complete Revision]

$25.00 $50.00

PIP ELSAP04

PIP ELSAP04

Uninterruptible Power Supply (UPS) System Specification [Complete Revision]

$60.00 $120.00