PIP PLSC0014

Installation Backfilling of ASME B31.4 and B31.8 Metallic & Non-Metallic Pipelines [Complete Revision]

Process Industry Practices, 09/01/2022

Publisher: PIP

File Format: PDF

$50.00$100.00


Published:01/09/2022

Pages:10

File Size:1 file , 260 KB

Note:This product is unavailable in Ukraine, Russia, Belarus

This Practice provides requirements for lowering-in pipe and fittings, making final tie-ins and inspections, and backfilling for steel and nonmetallic pipes for pipelines.

More PIP standard pdf

PIP PNSMV046

PIP PNSMV046

Plastic and Plastic-Lined Ball Valve Descriptions

$50.00 $100.00

PIP PN03CK1S01

PIP PN03CK1S01

Piping Material Specification 3CK1S01 Class 300, 2-1/4 CR - 1 MO, 0.063" C.A. Process

$37.00 $75.00

PIP ELSSG12D

PIP ELSSG12D

Date Sheet for Design and Fabrication of Outdoor Enclosures for Motor Controllers and Switchgear [Complete Revision]

$147.00 $295.51

PIP PCFTE000

PIP PCFTE000

Temperature Measurement Fabrication Details

$75.00 $150.00