• PIP RFTM1000

PIP RFTM1000

Monolithic Refractory Installation Qualification, Inspection, and Testing [Editorial Revision]

Process Industry Practices, 03/01/2013

Publisher: PIP

File Format: PDF

$75.00$150.00


Published:01/03/2013

Pages:17

File Size:1 file , 340 KB

Note:This product is unavailable in Ukraine, Russia, Belarus

This Practice provides requirements for quality control and quality assurance for the installation of monolithic refractory lining materials.

This Practice covers the general requirements for testing and inspecting of monolithic refractory linings. Test and inspection methods include installer prequalification, production sample testing, in-progress installation inspection, and final inspection of the completed lining.

More PIP standard pdf

PIP CVC01017

PIP CVC01017

Plant Site Data Sheet [Complete Revision]

$25.00 $50.00

PIP PNSC0035

PIP PNSC0035

Steam Tracing Specification [Complete Revision]

$487.00 $975.00

PIP CVC01017-EEDS (IP)

PIP CVC01017-EEDS (IP)

Electronic Entrey Data Sheet for Plant Site Data Sheet (US Customary Units)

$37.00 $75.00

PIP PCCA001

PIP PCCA001

Fixed Gas Detection Design Criteria

$50.00 $100.00