Your shopping cart is empty!
PDF Preview
Process Industry Practices, 10/01/2022
Publisher: PIP
File Format: PDF
$50.00$100.00
Published:01/10/2022
Pages:11
File Size:1 file , 250 KB
Note:This product is unavailable in Ukraine, Russia, Belarus
This Practice supplements ACI 336.1-01, Specification for the Construction of Drilled Piers. Together, this Practice and ACI 336.1-01 provide requirements for drilled pier construction. The requirements of ACI 336.1-01, as modified and supplemented by this Practice, are adopted by this Practice for the construction of drilled piers. Common industry terminology may also refer to drilled piers as caissons or drilled shafts.
Temperature Measurement Design Criteria [Reaffirmation with Editorial Revision]
$50.00 $100.00
Piping Material Specification 3NH0B02 Class 300, Alloy B3 (UNS N10675), Butt Weld, C.A. - None, Process [New Practice]
$37.00 $75.00
Instrumentation Electrical Design Criteria [Technical Revision]
Guidelines for Control Systems Documentation [Technical Revision]