PIP STS02380

Application of ACI 336.1-01, Specification for the Construction of Drilled Piers [Complete Revision]

Process Industry Practices, 01/01/2017

Publisher: PIP

File Format: PDF

$50.00$100.00


Published:01/01/2017

Pages:9

File Size:1 file , 260 KB

Note:This product is unavailable in Ukraine, Russia, Belarus

This Practice supplements ACI 336.1-01, Specification for the Construction of Drilled Piers. Together, this Practice and ACI 336.1-01 provide requirements for drilled pier construction. The requirements of ACI 336.1-01, as modified and supplemented by this Practice, are adopted by this Practice for the construction of drilled piers. Common industry terminology may also refer to drilled piers as caissons or drilled shafts.

More PIP standard pdf

PIP PN15SC0S01

PIP PN15SC0S01

Piping Material Specification 15SC0S01 Class 1500, 304H Stainless Steel, 0.000" C.A. Process

$37.00 $75.00

PIP PCSPA04D

PIP PCSPA04D

Process Analyzer Bid Proposal Data Sheets (Complete Revision)

$13.00 $27.00

PIP PCSPA001

PIP PCSPA001

Instructions for Process Analyzer Project Documentation Requirements Data Sheets (Complete Revision)

$25.00 $50.00

PIP PN09SC0S01

PIP PN09SC0S01

Piping Material Specification 9SC0S01 Class 900, 304H Stainless Steel, 0.000" C.A. Process

$37.00 $75.00