Your shopping cart is empty!
PDF Preview
Process Industry Practices, 12/01/2021
Publisher: PIP
File Format: PDF
$50.00$100.00
Published:01/12/2021
Pages:8
File Size:1 file , 330 KB
Note:This product is unavailable in Ukraine, Russia, Belarus
This Practice supplements ACI 351.4M-14, Specification for Installation of Cementitious Grouting between Foundations and Equipment Bases (Metric). Together, this Practice and ACI 351.4M-14 provide requirements for supplying, testing and installing nonshrink cementitious grout materials. This Practice is applicable for nonshrink cementitious grout materials installed between foundations and equipment and machinery bases as well as nonshrink cementitious grout materials installed between foundations and structural steel column bases. The requirements of ACI 351.4M-14, as modified and supplemented by this Practice, are adopted by this Practice for supplying, testing and installing nonshrink cementitious grout materials.
Electronic Entry Data Sheets for General Instrumentation Design Checklist [Complete Revision]
$25.00 $50.00
Electronic Entry Data Sheet for Design and Fabrication of Flooded-Cell Lead-Acid Batteries for Electrical Stations
Data Sheet for Flooded-Cell Lead-Acid Batteries [Complete Revision]
Fixed Gas Detection Design Criteria